• picture of ultrafast green laser with black background
  • pick glow from a Neon discharge
  • front entrance of UGA chemistry building

March 1, 2017

The second pump room is repaired and electrical and AC systems are starting to get installed.

20170301_153934_resized.jpg

Work continues in the laser lab.

20170301_153939_resized.jpg

The electrical raceways are going up on the platforms.

20170301_154021_resized.jpg