Dec 20th - The floor is fixed.

The trenches seen in the earlier photos were a surprise finding when they pulled up the old tile. It turns out that this was a teaching lab at one point and there were trenches with steam lines dug in the floor that nobody knew about. They have been filled and sealed and we now have a real floor!

Dec20_2016_a.jpg